On Monday, the Sindh High Court (SHC) ordered the destruction of an illegally constructed structure in the Gizri region of the port city.

According to the facts, the high court ordered the building’s power, water, and gas connections to be disconnected while it considered a petition against it.

The SHC has also directed that a report be provided to the court once the construction has been dismantled.